Snow removal operations began at 3:30 a.m.. For a better cleaning, full access to the bottom of your driveway is required.
Thank you and have a good day!
Blog
Our operations will begin around 9:30 a.m., following the city plows. Thank you for clearing out your driveway as soon as possible.
For deep driveways: The Client is responsible for keeping the driveway free of ice build up by throwing down salt or other type of abrasive.. Should there be no presence of abrasive on the driveway; the driver will not go down.
We shall not be responsible for any damage caused by a tractor which may slide due to an icy surface.
Thank you for your co-operation
It is the Client’s responsibility to remove the car(s) from their driveway as soon as possible, 9:00 a.m. at the latest, so that we can have full access to the driveway for proper finishing.
Thank you and have a beautiful day!
Snow removal operations began at 5:00 a.m. this morning following the city plows. For a better cleaning, full access to the bottom of your driveway is required.
Thank you and have a good day!